Find us on Facebook

  • Recent Posts

  • Browse Categories:

  • Archives by Month

Independence Hwy – Painting and Finishing Touches

April 27th, 2009 Posted in Independence Hwy. Remodel

The project is coming along as we move into the painting stage.  We were hoping to show you the flooring but it’s carefully protected by our crew during painting.  Hopefully we’ll be able to get a peak next week.copy-of-rose-heidi-pics-0051 copy-of-rose-heidi-pics-0372The painters put all the doors in one room while they work on them.  We call this our “Gallery of Doors.”  When we do a whole-house remodel like this one everything is done on a grand scale.

The Gallery of Doors

The Gallery of Doors

A custom etched glass laundry door is painted and awaits hanging.
Etched glass door

Etched glass door

New granite slab countertops look great in the kitchen.
Uba Tuba granite countertops with tile splash

Uba Tuba granite countertops with tile splash

This hood was custom built by our cabinet maker.  It’s a nice accent for the kitchen.
Custom built range hood

Custom built range hood

The painters are doing a beautiful job.  Once they are done we’ll be able to pull up the floor protection.  Carpet will be installed upstairs and in the living room and master suite.  After the carpet is in we’ll be finishing up the base trim and hanging all the doors.

Floor protection does its job

Floor protection does its job

Sorry, comments for this entry are closed at this time.