Find us on Facebook

  • Recent Posts

  • Browse Categories:

  • Archives by Month

Monroe Dormer Additions are Complete

May 8th, 2015 Posted in Monroe Dormers, Remodeling Projects | Comments Off on Monroe Dormer Additions are Complete

Construction on the dormers are complete!

The new dormers add more light into the second story and add great architectural interest to this farmhouse. We tied in the new roof as seamlessly as possible, the new windows match the existing, and the siding, paint and trim match the rest of the home. Additions should always look like they were part of the original structure, this is specially important with an older home.

Barton completion

Tags: , , , ,

Corvallis Family Room Addition in Progress #4

May 1st, 2015 Posted in Corvallis Family Room Addition, Remodeling Projects | Comments Off on Corvallis Family Room Addition in Progress #4

Construction of the walls, built-in fireplace and roof for the Family Room Addition

The family room addition and pantry is staring to take shape, the walls are up and the windows and doors are framed in. The existing house was built with Insulated Concrete Forms (ICF) and we have matched the thickness of the new walls in the addition for a seamless transition once the addition is completed.

Davis framing 1

Windows and the new built-in fireplace are framed in.

Davis framing 2

Ceiling and roof joist are in place.

Davis framing 3

Tags: , , , , , ,

Corvallis Family Room Addition in Progress #3

April 24th, 2015 Posted in Corvallis Family Room Addition, Remodeling Projects | Comments Off on Corvallis Family Room Addition in Progress #3

Framing has begun for the Family Room Addition

Things are moving fast for the family room addition in Corvallis. Since the foundation walls were completed and passed inspection, we moved right along to start framing the addition. The placement of the new windows and patio door can be seen and a new framed wall can be seen lying on the floor deck before it is raised. The family room addition is starting to take shape.

Progress of framing

Davis rough framing

Next, we will continue to rough frame the walls, windows and doors and frame in the new built-in fireplace. The joists for the ceiling and roof will be added next.

Tags: , , , ,

Monroe Dormer Additions in Progress #2

April 7th, 2015 Posted in Monroe Dormers, Remodeling Projects | Comments Off on Monroe Dormer Additions in Progress #2

The dormers on this beautiful farmhouse in Monroe are coming along great! The walls and roof are built; the windows installed, and next is the siding.

 

During Construction

Barton Progress 1

We tie in the new and old roof together.

Barton Progress 2

Before

What a huge difference dormers add for architectural interest!Barton Progress 3

Tags: , , , ,

Corvallis Family Room Addition in Progress #2

April 3rd, 2015 Posted in Corvallis Family Room Addition, Remodeling Projects | Comments Off on Corvallis Family Room Addition in Progress #2

Construction of the new foundation for the Family Room Addition

The new family room addition that we are working on in Corvallis is coming along smoothly. First we completed the excavation of the existing concrete porch and now we have built the foundation walls for the new addition.  The weather has served us well and has allowed us to stay right on schedule. The family is excited to look right out their window to see the progress of their new addition happen right before their eyes.

Progress of foundation

 

Davis foundation 3

Monolithic foundation forms after passing inspection and ready for pour

Davis foundation 1

Poured foundation with mudsill in place and ready for floor system

Tags: , , , , , , , ,