Second Street Review: Looking Back
Friday, February 12th, 2010 Posted in 2nd Street Remodel | No Comments »The house is now complete. Kate and Drew have been moved into the former attic space for several weeks now, and the pictures and furniture have all found their new homes. We though we’d take a short trip back ...
2nd Street Corvallis — Week #13: Stairs, Railings and Moving in
Wednesday, January 6th, 2010 Posted in 2nd Street Remodel | No Comments »Over the holidays, Kate and Drew decided that the time was right to move into the new space. The hardest thing of course, was bringing the tub up the stairs and into the bathroom. After the tub, everything else seems ...
Week #11: Addition Surfaces
Thursday, December 17th, 2009 Posted in 2nd Street Remodel | No Comments »Now that the space is completely built, the most fun and gratifying parts of the job can begin. The finishes are where the homeowner really starts to personalize the space and make it their own. Commonly thought of ...
Week #8-10: Solidifying the Space
Tuesday, December 15th, 2009 Posted in 2nd Street Remodel | No Comments »The road from dried-in to conditioned space has been an eventful and fulfilling journey on this second story addition in Corvallis. After all of the mechanicals are installed and inspected (plumbing, electrical, HVAC), the insulation can be placed into the ...
Week #6 & 7: Dried-In
Monday, November 23rd, 2009 Posted in 2nd Street Remodel | No Comments »In the last couple of weeks a lot has happened in the newly remodeled attic of this Corvallis addition. First and most importantly, the South dormer has been added to complete the new footprint and define the volume of ...