Even though the Blog had been down for a while, construction continued on at its natural pace and this Corvallis master bathroom remodel is now essentially done! After the wiring for the warm floor was installed, the tile was set on all the surfaces. It’s important to remember that the wires are in place after the tile is installed because you don’t want any contractors who come later to inadvertently damage the system by drilling or cutting into the floor tiles for any reason.
All the cabinetry, doors and trim are in place and finished to match the original cherry.
Tiles have been set and sealed on the tub deck and in the shower. These are the California Gold Slate which contrast nicely with the lighter porcelain floor tiles.
The entire master bathroom benefits from the light that the glass block shower window provides.
In the pictures shown here you can see that the frameless glass shower door had yet to be installed and that Barry was still experimenting with paint colors. The door is now in and he has since made his final decision on color.
In the next blog installment the room will be shown in its final, finished state.