The first week we were busy demo-ing the existing kitchen while our plumber was installing the rough plumbing. New gas lines to the range and the new fireplace were installed. The sink and plumbing shifted to the left a bit to center the sink under the window. This is a very common request we have when remodeling a kitchen with an offset sink.

The Demoed Kitchen

The Demoed Kitchen

The Demoed Family Room

The Willinator: a Turbo-Charged Dishwasher with Personality 🙂

Rough Electrical and Plumbing

Drywall holes for pulling electrical wires