Last week the plumbing and other underfloor mechanicals were inspected and OK’d by the city. Having passed this first milestone, the floor sheeting can now be installed. This makes work much easier for everyone now that there is a proper floor to walk on! The only thing not covered with the new floor sheeting is the opening for the future stair.

Ted and Dean admire their new floor sheeting

The Roll-Back Roof Cover

Exterior of House