Week #6
This week we dried-in the master suite addition and continued working on the interior framing. While standing inside the addition, you can just start to see the outline of the closet and bathroom on the side of the building closest to the street. The clothing in the closet and structure of the bathroom should help block street noise from the bedroom. Also, the windows on that end of the house will be laminated glass, further helping keep the bedroom a quiet retreat. We had all 17 new windows delivered to the site this week. They are being safely stored in the garage until we start installing them, hopefully next week. The framing for the windows is shown in the photo above. The plywood on the outside of the framing is to help sturdy the structure and keep moisture out until the windows are installed. With the framing of the master suite addition almost complete, we’ll start framing the kitchen addition next week!