The road from dried-in to conditioned space has been an eventful and fulfilling journey on this second story addition in Corvallis. After all of the mechanicals are installed and inspected (plumbing, electrical, HVAC), the insulation can be placed into the stud bays on the exterior walls and ceilings. The sound deadening quality of the insulation gives the space a real sense of protective enclosure. After this step, the real work of defining plane and volume begins. Drywall has been installed on all of the previously open stud walls. There are a lot of corners and angles to be cut and finished and it takes an experienced worker to make all of the cuts fit tightly to the framing.